CTH G over CEDAR CREEK

0.8M N JCT STH 60 · County 131, Wisconsin · Built 1956 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B66001900000000
Year Built
1956
Reconstructed
1975
Length
24.7 m (81 ft)
Max Span
12.2 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.