USH 63 over USH 53

6 MI N JCT STH 70 · County 129, Wisconsin · Built 2022 · 2 Lanes · 4,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
B65005600000000
Year Built
2022
Length
104.9 m (344.2 ft)
Max Span
37.8 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
4,600
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,357,000
Total Project Cost
$2,035,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.