CTH XX over COE HOLLOW CREEK

3.7M S JCT STH 56 · County 123, Wisconsin · Built 1941 · 2 Lanes · 195 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B62080900000000
Year Built
1941
Length
8.3 m (27.2 ft)
Max Span
7.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
195
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$98,000
Total Project Cost
$148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.