LRD TAINTER HOLLOW over BRANCH TAINTER CREEK

1.6 M E JCT STH 27 · County 123, Wisconsin · Built 2022 · 2 Lanes · 47 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B62026200000000
Year Built
2022
Length
11.1 m (36.4 ft)
Max Span
10.4 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
47
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.