CTH P over TIMBER COULEE CREEK

1.6M N JCT STH 27 · County 123, Wisconsin · Built 2021 · 2 Lanes · 190 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B62026000000000
Year Built
2021
Length
13.1 m (43 ft)
Max Span
12.1 m
Width
20.9 m (68.6 ft)
Lanes
2
Daily Traffic
190
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.