LRD SOUTH ELK RUN over ELK RUN

1.4M W JCT CTH SS · County 123, Wisconsin · Built 2019 · 2 Lanes · 58 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B62025400000000
Year Built
2019
Length
18.5 m (60.7 ft)
Max Span
17.7 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
58
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.