CTH FF E MADISON over S BR BARABOO RIVER

0.1M E JCT STH 33 · County 123, Wisconsin · Built 2020 · 2 Lanes · 660 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B62012800000000
Year Built
2020
Length
11.1 m (36.4 ft)
Max Span
10.1 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
660
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.