CTH N over NORWEGIAN HOLLOW CREEK

3.2M S JCT STH 56 · County 123, Wisconsin · Built 1993 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B62011500000000
Year Built
1993
Length
21.4 m (70.2 ft)
Max Span
10.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
140
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.