LRD THOMPSON RD (D over S BEAR CREEK

0.1M S JCT CTH D · County 123, Wisconsin · Built 1987 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B62008800000000
Year Built
1987
Length
20.7 m (67.9 ft)
Max Span
10.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
20
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.