CTH P over KICKAPOO RIVER

1.2M W JCT STH 131 · County 123, Wisconsin · Built 1955 · 2 Lanes · 108 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B62001100000000
Year Built
1955
Length
31.9 m (104.7 ft)
Max Span
30.5 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
108
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.