USH 10-USH 53-10TH over BUFFALO RIVER

0.9M E JCT CTH K · County 121, Wisconsin · Built 1937 · 2 Lanes · 4,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B61028200000000
Year Built
1937
Reconstructed
1965
Length
17.1 m (56.1 ft)
Max Span
16 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$268,000
Total Project Cost
$403,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.