LRD JOE COULEE ROA over NORTH FORK BEAVER CREEK

0.2M N JCT CTH C · County 121, Wisconsin · Built 2022 · 2 Lanes · 90 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B61024500000000
Year Built
2022
Length
13.9 m (45.6 ft)
Max Span
13.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
90
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.