STH 95 over LAKES COULEE CREEK

3.7M E JCT CTH D · County 121, Wisconsin · Built 1975 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B61005500000000
Year Built
1975
Length
27.7 m (90.9 ft)
Max Span
26.8 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.