CTH D over ELK CREEK

0.2M N JCT CTH E · County 121, Wisconsin · Built 1958 · 2 Lanes · 542 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B61003800000000
Year Built
1958
Length
24.1 m (79.1 ft)
Max Span
9.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
542
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000
Total Project Cost
$406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.