CTH M over YELLOW RIVER

1.1M E JCT CTH G · County 119, Wisconsin · Built 2019 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
B60014600000000
Year Built
2019
Length
29.4 m (96.5 ft)
Max Span
14.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.