LRD SECOND ST (DEA over SILVER CREEK
0.3M S JCT CTH D · County 119, Wisconsin · Built 1997 · 1 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
45.35225, -90.298417
This bridge is in worse condition than 68.2% of bridges in County 119. The average bridge in Wisconsin is 0 years old; this one is 29 years old.
Nearby Bridges
LRD BUS HWY 13 over SILVER CREEK
Built 2014
STH 13 over SILVER CREEK
Built 1974
CTH D over SILVER CREEK
Built 1976
STH 13 over ATV TRAIL (OVER OLD SOO
Built 1974
CTH D over SILVER CREEK
Built 1960
LRD LUCIA RD over SILVER CREEK
Built 1976
LRD ZIMMERMAN RD over SILVER CREEK
Built 1975
STH 102 over BIG RIB RIVER
Built 1958
LRD STATE RD over LITTLE RIB RIVER
Built 1926
STH 102 over TRIB RIB LAKE
Built 2012
Bridge Details
- Structure #
- B60007900000000
- Year Built
- 1997
- Length
- 13.8 m (45.3 ft)
- Max Span
- 13 m
- Width
- 6 m (19.7 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $141,000
- Total Project Cost
- $211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.