CTH B/5TH AVE over YELLOW RIVER

0.4M S JCT STH 64 · County 119, Wisconsin · Built 1971 · 2 Lanes · 640 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
B60001500000000
Year Built
1971
Length
68.6 m (225.1 ft)
Max Span
22.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
640
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$691,000
Total Project Cost
$1,037,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.