CTH JM over SHEBOYGAN RIVER

0.4M W JCT CTH M · County 117, Wisconsin · Built 1991 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B59015100000000
Year Built
1991
Length
35.3 m (115.8 ft)
Max Span
17.4 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
450
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.