LRD PLAYBIRD RD over PIGEON RIVER

0.3M E JCT STH 32 · County 117, Wisconsin · Built 1988 · 2 Lanes · 387 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B59013600000000
Year Built
1988
Length
36 m (118.1 ft)
Max Span
14 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
387
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.