LRD SPRING BROOK R over S BR EMBARRASS RIVER

0.4M N JCT CTH M · County 115, Wisconsin · Built 1981 · 2 Lanes · 235 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
B58003000000000
Year Built
1981
Length
17 m (55.8 ft)
Max Span
8.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
235
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$165,000
Total Project Cost
$248,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.