CTH O over HONEY CREEK

2.6M W JCT STH 60 · County 111, Wisconsin · Built 1996 · 2 Lanes · 584 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B56012400000000
Year Built
1996
Length
41 m (134.5 ft)
Max Span
13.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
584
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.