CTH A over IH 90-IH 94
0.2M S JCT CTH T · County 111, Wisconsin · Built 1960 · 2 Lanes · 2,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.563972, -89.7385
This bridge is in worse condition than 76.7% of bridges in County 111. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
LRD GILLEM RD over IH 90-IH 94
Built 1960
USH 12 EB RAMP over LRD MOON RD
Built 2010
USH 12 WB over LRD MOON RD
Built 2010
USH 12 EB over LRD MOON RD
Built 2010
IH 90 EB-IH 94 EB over USH 12
Built 1960
IH 90 WB-IH 94 WB over USH 12
Built 1960
USH 12 EB over CTH BD
Built 2010
USH 12 WB over CTH BD
Built 2010
LRD SHADY LANE over USH 12
Built 2010
CTH T over IH 90-IH 94
Built 1961
Bridge Details
- Structure #
- B56003400000000
- Year Built
- 1960
- Length
- 65.3 m (214.2 ft)
- Max Span
- 21.2 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $742,000
- Total Project Cost
- $1,113,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.