LRD 250TH ST over WILLOW RIVER

2.2M S JCT CTH H · County 109, Wisconsin · Built 1988 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B55010800000000
Year Built
1988
Length
21.3 m (69.9 ft)
Max Span
10.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
80
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.