CTH K over WIS CENTL LTD/ STH 64

0.5M N JCT STH 64 · County 109, Wisconsin · Built 1976 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B55006900000000
Year Built
1976
Reconstructed
2006
Length
98.9 m (324.5 ft)
Max Span
22.6 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,600
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.