CTH H over CLEAR CREEK

1.2M W JCT STH 40 · County 107, Wisconsin · Built 2004 · 2 Lanes · 209 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B54010500000000
Year Built
2004
Length
11.4 m (37.4 ft)
Max Span
10.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
209
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.