IH39SB/IH90EB over ROCK RIVER / ELLENDALE R

0.4M E JCT STH 59 TO E · County 105, Wisconsin · Built 2018 · 3 Lanes · 26,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B53035700000000
Year Built
2018
Length
221.9 m (728 ft)
Max Span
39 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
26,750
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,808,000
Total Project Cost
$4,213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.