IH 39 NB / IH 90 W over CNW/UP RR

4.4M W JCT CTH S TO E · County 105, Wisconsin · Built 2018 · 3 Lanes · 32,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B53032200000000
Year Built
2018
Length
80 m (262.5 ft)
Max Span
34.1 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
32,550
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.