USH 51-CENTER AVE over UNION PACIFIC RR

11.3M N JCT STH 81 · County 105, Wisconsin · Built 1982 · 4 Lanes · 14,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B53013500000000
Year Built
1982
Length
8.5 m (27.9 ft)
Max Span
8.1 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
14,600
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.