LRD NELSON RD over BR SUGAR RIVER

3.8M S JCT STH 81 · County 105, Wisconsin · Built 1958 · 2 Lanes · 119 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B53002200000000
Year Built
1958
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
119
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.