CTH H over GAULT HOLLOW CREEK

0.1 M S JCT CTH I · County 103, Wisconsin · Built 2022 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B52028000000000
Year Built
2022
Length
15.4 m (50.5 ft)
Max Span
14.6 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.