CTH V over CAZENOVIA BRANCH

0.6M W JCT STH 58 · County 103, Wisconsin · Built 1978 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B52005900000000
Year Built
1978
Length
27.4 m (89.9 ft)
Max Span
26.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.