STH 60 over HOOVER HOLLOW CREEK

3.6M E JCT USH 61 TO N · County 103, Wisconsin · Built 1961 · 2 Lanes · 1,400 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B52003100000000
Year Built
1961
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
1,400
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.