CTH T over NORTH CHANNEL WISC RIVER

0.1M S JCT STH 60 · County 103, Wisconsin · Built 1958 · 2 Lanes · 1,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B52002500000000
Year Built
1958
Length
167.9 m (550.9 ft)
Max Span
19.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,833,000
Total Project Cost
$2,750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.