CTH G over ROOT RIVER CANAL

0.5M E JCT CTH U · County 101, Wisconsin · Built 1949 · 2 Lanes · 1,802 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
B51057500000000
Year Built
1949
Reconstructed
1982
Length
34.5 m (113.2 ft)
Max Span
16.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,802
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$415,000
Total Project Cost
$622,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.