STH 38-STATE ST over LRD WISCONSIN AVE
0.1M N JCT STH 32 · County 101, Wisconsin · Built 1988 · 4 Lanes · 4,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
42.731661, -87.7852
This bridge is in worse condition than 98.5% of bridges in County 101. The average bridge in Wisconsin is 0 years old; this one is 38 years old.
Nearby Bridges
STH 32-N MAIN ST over ROOT RIVER
Built 1996
LRD MARQUETTE ST over ROOT RIVER
Built 1991
LRD 6TH ST VIADUCT over LRD HOWE ST
Built 1986
LRD 6TH ST over ROOT RIVER/ROOT RIVER PA
Built 1983
LRD HORLICK DR - N over ROOT RIVER
Built 2005
LRD MEMORIAL DR over ROOT RIVER
Built 1936
LRD SPRING ST over ROOT RIVER
Built 1966
LRD HORLICK DR - over ROOT RIVER
Built 2004
LRD W 6TH ST over LRD HORLICK DR ROOT RIV
Built 2022
STH 20-WASHINGTON over LRD MEMORIAL DR
Built 1969
Bridge Details
- Structure #
- B51006900000000
- Year Built
- 1988
- Length
- 89.2 m (292.7 ft)
- Max Span
- 33.6 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 4,600
- Material
- Steel
- Design
- Movable - Bascule
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,494,000
- Total Project Cost
- $2,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.