STH 38-NORTHWESTER over ROOT RIVER

2.7M N JCT STH 32 · County 101, Wisconsin · Built 1958 · 5 Lanes · 26,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B51001200000000
Year Built
1958
Length
52 m (170.6 ft)
Max Span
17.6 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
26,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$901,000
Total Project Cost
$1,352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.