STH 102 over S FK SPIRIT R

6 MILE SOUTH OF STH 86 · County 099, Wisconsin · Built 2011 · 2 Lanes · 390 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B50008100000000
Year Built
2011
Length
10.8 m (35.4 ft)
Max Span
10.1 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
390
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$145,000
Total Project Cost
$218,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.