CTH O over S FK JUMP RIVER

7.5M E JCT USH 8 · County 099, Wisconsin · Built 1959 · 2 Lanes · 112 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
3
Serious
Substructure
4
Poor

Bridge Details

Structure #
B50000600000000
Year Built
1959
Length
49.3 m (161.7 ft)
Max Span
20.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
112
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$763,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.