CTH S over HAYDEN CREEK

0.5M N JCT CTH M · County 097, Wisconsin · Built 1981 · 2 Lanes · 559 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B49005100000000
Year Built
1981
Length
9.9 m (32.5 ft)
Max Span
9.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
559
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.