STH 35 over TRIMBELLE RIVER

0.4M N JCT CTH K · County 093, Wisconsin · Built 1962 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

44.625753, -92.579542

This bridge is in worse condition than 66.4% of bridges in County 093. The average bridge in Wisconsin is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
B47098200000000
Year Built
1962
Length
48.2 m (158.1 ft)
Max Span
21.3 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$653,000
Total Project Cost
$980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.