LRD FREISTADT ROAD over PIGEON CREEK

0.6 M E OF JCT STH 181 · County 089, Wisconsin · Built 1999 · 2 Lanes · 3,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B45000700000000
Year Built
1999
Length
10.8 m (35.4 ft)
Max Span
10.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,200
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.