CTH NN over CEDAR CREEK

1.1M E JCT CTH Y · County 089, Wisconsin · Built 1992 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
B45000400000000
Year Built
1992
Length
32.5 m (106.6 ft)
Max Span
16.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.