LRD E HARRIER LANE over APPLE CREEK

0.1 M EAST OF N OSPREY DR · County 087, Wisconsin · Built 2022 · 2 Lanes · 99 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
B44048300000000
Year Built
2022
Length
10.5 m (34.4 ft)
Max Span
9.8 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
99
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.