STH 54 over UNNAMED CREEK

1.43 MI E OF STH 47 · County 087, Wisconsin · Built 2023 · 3 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B44046900000000
Year Built
2023
Length
12 m (39.4 ft)
Max Span
11.3 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
5,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.