LRD BANTA CT over FOX RIVER POWER CANAL

UNDER COLLEGE AVE BRIDGE · County 087, Wisconsin · Built 2009 · 2 Lanes · 1,656 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B44027500000000
Year Built
2009
Length
20.1 m (65.9 ft)
Max Span
18.9 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
1,656
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.