STH 54 EB over EMBARRASS RIVER

0.3M E JCT USH 45 · County 087, Wisconsin · Built 1993 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B44014700000000
Year Built
1993
Length
80.5 m (264.1 ft)
Max Span
39.6 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.