LRD SPENCER ST over SOO LINE
1.5M E JCT USH 41 · County 087, Wisconsin · Built 1980 · 4 Lanes · 8,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.258597, -88.436581
This bridge is in worse condition than 35.1% of bridges in County 087. The average bridge in Wisconsin is 0 years old; this one is 46 years old.
Nearby Bridges
STH 125 over SOO LINE
Built 1952
STH 47-MEMORIAL DR over FOX RIVER
Built 1982
LRD PROSPECT AVE over LRD JACKMAN ST
Built 2015
LRD SPENCER ST over MUD CREEK
Built 1990
STH 125-W COLLEGE over MUD CREEK
Built 2023
LRD APPLETON ST SB over LRD JONES PARK RD
Built 1980
LRD APPLETON STREE over ENTRANCE TO JONES PARK
Built 2019
IH USH 10 WB-IH 41 over LRD SPENCER ST
Built 1992
IH 41 SB over LRD SPENCER ST
Built 1992
IH USH 10 WB-IH 41 over STH 125 (COLLEGE AVE)
Built 1992
Bridge Details
- Structure #
- B44009600000000
- Year Built
- 1980
- Length
- 32.2 m (105.6 ft)
- Max Span
- 13.1 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 8,300
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Railroad
- Last Inspected
- N/A
- Est. Improvement
- $586,000
- Total Project Cost
- $879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.