CTH D over SUGAR CAMP CREEK
0.8M W JCT CTH H · County 085, Wisconsin · Built 1960 · 2 Lanes · 849 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 9 | Excellent |
Location
45.857639, -89.3879
This bridge is in worse condition than 82% of bridges in County 085. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
CTH D over CHAIN ECHO CHANNEL
Built 1976
CTH O over WISCONSIN RIVER 52
Built 1979
STH 70 over WISCONSIN RIVER 53
Built 1993
STH 17-STH 70 over MUD CREEK
Built 1981
CTH J over PICKERAL DOG LAKES
Built 1937
USH 45-STH 17-STH over EAGLE RIVER
Built 2000
CTH D over WISCONSIN RIVER 51
Built 2009
STH 70 over SAINT GERMAIN RIVER
Built 1968
CTH E over GILMORE CREEK
Built 1996
CTH G over WISCONSIN RIVER
Built 2004
Bridge Details
- Structure #
- B43000600000000
- Year Built
- 1960
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.8 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 849
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $216,000
- Total Project Cost
- $324,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.