CTH F over NORTH BR OCONTO RIVER

4.8MI EAST OF STH 32 · County 083, Wisconsin · Built 2009 · 2 Lanes · 510 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
B42012500000000
Year Built
2009
Length
38.1 m (125 ft)
Max Span
36.6 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.