USH 141 NB over OCONTO RIVER

1.9M S JCT STH 22 · County 083, Wisconsin · Built 2000 · 2 Lanes · 6,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B42007400000000
Year Built
2000
Length
77.2 m (253.3 ft)
Max Span
38 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
6,950
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.